摘要
从流程配置、消耗.投资等多个方面,综合比较研究水煤浆制氢装置气化激冷流程、废热锅炉流程与变换工艺的匹配性,并给出初步的结论。
In this paper,the matching study of gasification quench flow,reboiling flow and shift process in coal-slurry hydrogen production unit is studied comprehensively from the aspects of flow configuration,consumption and investment,etc.A preliminary conclusion was presented.
作者
魏东
王立成
Wei Dong;Wang Licheng(SINOPEC Ningbo Engineering Co.,Ltd.,Ningbo 315103)
出处
《大氮肥》
CAS
2020年第5期306-309,共4页
Large Scale Nitrogenous Fertilizer Industry