冬奥会雪上场馆全寿命期BIM需求分析

BIM Demand Analysis During the Life Cycle of WinterOlympics Snow Sports Venues
下载PDF
导出
摘要 在冬奥会雪上场馆的建设过程中,为解决由于信息需求多样性和项目本身独特性所带来的BIM应用受阻问题,以张家口赛区和延庆赛区为调研对象,分析了雪上场馆项目全寿命期内各参与方对BIM的需求情况。结果表明:业主方密切关注项目全寿命期内各阶段BIM的应用,设计方与施工方对依托BIM的协同作业的配合程度要求较高,专项设计与构件生产方聚焦在更加专业细节的BIM功能。另外,体现冬奥特点的BIM特殊需求,因项目阶段和信息类型的不同存在较大差异性。这可为BIM辅助冬奥会雪上场馆项目的设计、施工和运营提供有效参考. The diverse demand of information and the uniqueness of Winter Olympics snow sports venue projects hinder theapplication of BIM.To address this issue,this research analyzes the stakeholders’demand of BIM functions from a life cycleperspective by investigating Zhangjiakou and Yanqing game areas.The results show that the owners pay attention to the applicationof BIM in each stage of the project;the designers and contractors have more requirements for BIM-aided cooperation;and the specialdesigners and component manufacturers focus on professional and detailed BIM functions.In addition,it is found that the uniquedemand of BIM in the winter olympics is of a great difference in terms of project stages and information types.This study canprovide insights into the BIM-aided design,construction and operation of winter olympics snow sports venues.
作者 张知田 司佳丽 郭红领 刘嘉丰 ZHANG Zhi-tian;SI Jia-li;GUO Hong-ling;Lao Ka-fong(Department of Construction Management,Tsinghua University,Beijing 100084)
出处 《工程管理学报》 2020年第5期64-68,共5页 Journal of Engineering Management
基金 “十三五”国家重点研发计划项目(2018YFF0300301).
关键词 冬奥会 雪上场馆 全寿命期 BIM 需求分析 winter olympics snow sports venue life cycle BIM demand analysis
  • 相关文献

参考文献7

二级参考文献48

  • 1林良帆,邓雪原.BIM数据存储标准与集成管理研究现状[J].土木建筑工程信息技术,2013,5(3):14-19. 被引量:13
  • 2李建成.建筑信息模型与建设工程项目管理[J].项目管理技术,2006,4(1):58-60. 被引量:19
  • 3Babie NC, Podbreznik P, Rebolj D. Integrating resourc.e production and construction using BIM[J]. Autom Constr, 2010,19(5 ):539-543.
  • 4Sacks R, Treckmann M, Rozenfeld O. Visualization of work flow to support lean construction[J]. J Constr Eng Man- age,2009,135(12) : 1307-1315.
  • 5Sacks R, Radosavljevic M, Barak R. Requirements for building information mudeling based lean production man- agement systems for construction[J]. Autom Constr,2010, 19 (5) :641-655.
  • 6Singh V, Gu N, Wang X. A theoretical fiamework of a BIM-based muhi-diseiplinary collaboration platform [J]. Aurora Constr,2011,20(2):134-144.
  • 7Arayici Y, Coates P, Koskela L, et al. Technology adop- tion in the BIM implementation for lean architectural practiee[J]. Aurora Constr,2011,20(2): 189-195.
  • 8Sacks R, Koskela L, Dave BA, et al. Interaction of lean and building information modeling in construction[J]. J Constr Eng Manage, 2010, 136 (9) :968-980.
  • 9Clarke JA, Johnstone CM, Kelly NJ, et al. The role of built environment energy efficiency in a sustainable UK energy economy[J]. Energy Policy,2008,36(12):4605-4609.
  • 10H Edward Gohlberg. BIM and the Buihting lnhrmation Model (AEC in focus column) [J]. CADalyst, 2007, 21 (1) : 56-58.

共引文献259

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部