针对解吸水解系统运行中出现的外排水超标的现象,分析查找出其原因,通过工艺参数调节和设备维护等处理措施,逐步使外排废水达到设计外排指标.
In view of the phenomenon that the external drainage exceeds the standard in operation of desorption hydrolysis system,the causes are analyzed and found out.Through treatment measures of adjustment of process parameter and equipment maintenance,the discharged wastewater can gradually reach the designed discharge index.