期刊文献+

工业厂房金属耗能器罕遇地震弹塑性时程分析

Inelastic time-history analysis of buckling restrained brace on industrial plant
下载PDF
导出
摘要 为研究大跨度、重荷载、高净高工业厂房设置金属耗能器的抗震性能,以某多层框架结构工业厂房为例,对原结构和金属耗能器结构进行非线性动力弹塑性分析,分析可知,弹性阶段,金属耗能器能提供侧向刚度,控制层间位移;塑性阶段,金属耗能器能耗能减震,成为抗震第一道防线,且兼具经济性和安全性。 In order to study the seismic performance of the large-span and heavy loaded industrial plant.Based on a multilayer RC frame industrial plant as an example,this paper carries on nonlinear dynamic elastic-plastic buckling analysis on the original structure and the buckling restrained braced RC frames with the ETABS2016 software.The analysis results showed that in the elastic stage,the buckling restrained braces provided effective lateral stiffness,which improved the structure anti-torsion performance and the story drift decreased,in the plastic stage,the buckling restrained braces could give larger damping and energy dissipation performance,which could be the first line of defense for seismic energy dissipation of the structure.BRB has obvious advantage on economy and safety.
作者 周珺 Zhou Jun(Shanghai Nuclear Engineering Design&Research Institute Co.,Ltd.,Shanghai 200033,China)
出处 《山西建筑》 2020年第23期54-55,86,共3页 Shanxi Architecture
关键词 金属耗能器 工业厂房 弹塑性时程分析 塑性铰 buckling restrained brace industrial plant inelastic time-history analysis plastic hinge
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部