摘要
文中以实际案例分析工程变更对工程结算造价的影响,并提出减少及避免工程变更的应对措施。
In this paper, actual cases are used to analyze the impact of project changes on the project settlement cost, and countermeasures to reduce and avoid project changes are proposed.
作者
陈秋云
Chen Qiuyun(Xiamen Gulong Hot Spring Villa Development Co.Ltd.,Xiamen,Fujian 361000)
出处
《江西建材》
2020年第11期223-224,共2页
Jiangxi Building Materials
关键词
工程变更
工程结算
造价影响
Engineering change
Engineering settlement
Cost impact