摘要 投入较多的钢包进行周转,会使钢包空包等待时间较长,炼钢能耗增加、钢包热振次数增加、安全运行风险增加。盲目的减少钢包周转数量会出现转炉等包甚至铸机浇铸中断等问题。结合首秦金属材料有限公司的工装设备特点,基于炉机匹配原则,以铸机稳定连续浇铸为核心,进行详细的参数解析。利用核心周期计算方法,计算合理的钢包周转数量,确定了首秦不同铸机搭配浇铸时钢包周转数量。通过加强铸机浇次计划与钢包周转计划的结合,明确各工序标准作业时间,优化工艺路线,加强钢包管理等措施,使钢包周转个数由平均13.5个降低到12个。 If more ladles are put in for turnover,the waiting time for empty ladles will be longer,the energy consumption of steelmaking will increase,and the number of thermal vibration times of ladles will increase.Blindly reducing the turnover of ladle will lead to problems such as converter waiting for ladles and even the interruption of casting machine.Combined with the characteristics of equipment of Shouqin Metal Material Co.,Ltd.,the detailed parameter analysis was carried out based on the principle of furnace-caster matching and with the caster stable continuous casting as the core.The core cycle calculation method was used to calculate the reasonable turnover quantity of ladle and determine the turnover quantity of ladle when different casting machines were used in Shouqin.By strengthening the combination of casting machine casting schedule and ladle turnover plan,clarifying the standard operating time of each process,optimizing the process route,and strengthening ladle management,the number of ladle turnover was reduced from 13.5 to 12.
作者 李永生 胡显堂 石树东 崔小勇 刁德全 LI Yongsheng;HU Xiantang;SHI Shudong;CUI Xiaoyong;DIAO Dequan(Steel Rolling Department,Shougang Jingtang Iron and Steel Joint Co.,Ltd.,Tangshan 063000,China;Market Department,Qinhuangdao Shougang Krosaki Refractory Co.,Ltd.,Qinhuangdao 066000,China)
出处 《炼钢》 CAS 北大核心 2020年第5期63-68,共6页 Steelmaking
关键词 钢包 连铸机 炉机匹配 钢包周转计划 steel ladle continuous caster furnace-caster matching ladle turnover plan
  • 相关文献

参考文献6

二级参考文献46

共引文献41

同被引文献47

引证文献5

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部