摘要
围绕我国枢纽机场轨道交通集疏运发展问题,通过对枢纽机场轨道交通接入时间、发展历程等现状总结,提炼目前我国机场轨道交通集疏运系统发展存在的衔接、服务质量、经营管理等方面存在的不足。提出了做好枢纽机场发展轨道交通预留、发展多制式、多服务层次机场轨道交通集疏运系统,建立机场与轨道交通运营主体良好合作关系等建议。
This paper focuses on the construction and development of rail transit in China's hub airports.Based on the summary of the basic status quo of the hub airport rail transit access time,development process and other aspects,this paper summarizes the shortcomings of the current airport rail transit collection and distribution system development in China,such as the connection,service quality,operation and management.On this basis,some suggestions are put forward for the development of hub airports,such as the reservation of rail transit,the development of airport rail transit collection and distribution system with multi-system and multi-level service,and the establishment of a good cooperative relationship between the airport and rail transit operators.
作者
刘晓青
杨伟娜
梁英慧
LIU Xiaoqing;YANG Weina;LIANG Yinghui(China Civil Aviation Engineering Consulting Co.,Ltd,Beijing 100621,China)
出处
《综合运输》
2020年第11期35-39,47,共6页
China Transportation Review
基金
国家发展改革委基础研究司资助项目:枢纽机场旅客轨道集疏运系统研究
关键词
枢纽
机场
轨道交通
集疏运系统
建议
Hub
Airport
Rail transit
Collection and distribution System
Suggestion