摘要
作为电力系统的重要构成部分,高压输电线路负责电力系统中的电能传输,将变电站与变电站连接起来,使变电站与发电厂相连,并使它们正常运行。其中,铁塔组作为输电线路建设的基本环节,其建设技术和方案优化将对电力建设项目产生根本影响。本文分析了输电线路铁塔的施工技术,并分析了施工方案的优化策略。
As an important part of the power system,high voltage transmission line is responsible for the power transmission in the power system,connecting the substation with the substation,connecting the substation with the power plant,and making them operate normally.Among them,tower group is the basic link of transmission line construction,and its construction technology and scheme optimization will have a fundamental impact on the power construction project.This paper analyzes the construction technology of transmission line tower,and analyzes the optimization strategy of construction scheme.
出处
《电力系统装备》
2020年第21期58-59,共2页
Electric Power System Equipment
关键词
输电线路
组立
铁塔施工技术
应用策略
transmission line
erection
tower construction technology
application strategy