摘要
水电站水轮发电机定子在现场进行整体下线时,下线质量的好坏关系到将来机组的安全稳定运行,苗尾水电站水轮发电机定子下线过程中采用了新技术、新工艺,在较短工期内,通过强化工序管控,改进工艺,提高了下线质量与施工效率。本文介绍了苗尾水电站水轮发电机定子下线工艺,为同类型电站提供技术支持和参考。
When the hydro generator stator of hydropower station is installed on site,the quality of the winding is related to the safe and stable operation of the unit in the future.New technology and new technology are adopted in the stator winding process of the hydro generator of Miaowei hydropower station.In the short construction period,through strengthening the process control and improving the process,the offl ine quality and construction effi ciency are improved.This paper introduces the Miaowei hydropower station The stator winding technology of hydro generator in power station can provide technical support and reference for the same type of power station.
作者
原嘎嘎
付有泰
Yuan Ga-ga;Fu You-tai
出处
《电力系统装备》
2020年第21期68-70,共3页
Electric Power System Equipment
关键词
水电站
定子下线
工艺
hydropower station
stator winding
Technology