盾构隧道下穿宁启铁路(南通站)工程技术方案分析 被引量:3

Analysis on Technical Scheme of Shield Tunnel underneath Nanjing-Qidong Railway(Nantong Railway Station)
下载PDF
导出
摘要 结合南通城市轨道交通2号线盾构隧道下穿宁启铁路(南通站)实际工程,介绍了盾构隧道穿越宁启铁路股道、站台、雨棚柱、旅客出站地道以及铁路用房的设计方案,同时建立三维模型对盾构隧道穿越施工进行数值模拟,根据计算结果提出了一些穿越宁启铁路(南通站)的保护措施以及相关要求,确保盾构下穿施工时南通站的安全,为类似工程施工积提供工程经验。 Based on Nantong metro line 2 shield tunnel project,this paper introduces the design of shield tunnel underneath railway track,station,canopy,passenger export and railway building.At the same time,the finite numerical model of shield tunnel crossing railway track is established.According to the calculation results,some protection measures and relevant requirements for crossing Ningqi railway(Nantong station)are put forward to ensure the safety of Nantong station during shield tunnelling,providing experience for similar projects.
作者 赵星 ZHAO Xing(China Railway Siyuan Survey and Design Group Co.,Ltd.Wuhan 430063)
出处 《现代隧道技术》 EI CSCD 北大核心 2020年第S01期581-587,共7页 Modern Tunnelling Technology
关键词 盾构隧道 南通站 宁启铁路 股道 雨棚柱 Shield tunnel Nantong railway station Nanjing-Qidong railway Railway track Canopy
  • 相关文献

同被引文献26

引证文献3

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部