期刊文献+

富水圆砾地层中地下连续墙施工技术研究 被引量:4

Study on Construction Technology of Underground Diaphragm Wall in Water-rich Gravel Stratum
下载PDF
导出
摘要 富水圆砾地层分布厚度较大、透水性强、自稳性差,可能导致连续墙施工塌孔、不利成槽等困难。为了保证工程的稳定性,文章以呼和浩特市地铁2号线04标段富水圆砾地层中地下连续墙施工为背景,开展富水圆砾地层中地下连续墙的施工技术研究,总结出现的问题和解决方法,结合实际工程的监测数据与数值模拟结果进行对比分析,表明数值模拟结果和实际较接近,并提出了在富水圆砾地层中施工地下连续墙的技术特点。 The water-rich pebble stratum is characterized by a large distribution thickness,high permeability and poor stability,which may lead to the collapse of the underground diaphragm wall during construction and unfavorable conditions for trenching.In order to ensure the stability of the project,a construction project of underground diaphragm wall in water-rich pebble stratum is taken as an example.The construction site is in the lot 4 of Metro line 2 in Hohhot city,and the problems and corresponding solutions are summarized.The monitoring data obtained from the project are compared with the results of numerical simulation.The results show that the numerical results agree well with the monitored values;the technical aspects of construction of the underground diaphragm wall in water-rich pebble stratum are revealed.
作者 刘海华 张凯 LIU Haihua;ZHANG Kai(China Railway 16th Bureau Group Co.,Ltd.,Beijing 100018)
出处 《现代隧道技术》 EI CSCD 北大核心 2020年第S01期897-902,共6页 Modern Tunnelling Technology
基金 中铁十六局集团有限公司科技研究开发计划(K2018-24C).
关键词 富水圆砾 地墙 施工技术 监测 数值模拟 Water-rich pebble Underground diaphragm wall Construction technology Monitoring Numerical simulation
  • 相关文献

参考文献7

二级参考文献97

共引文献258

同被引文献20

引证文献4

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部