大直径主动铰接盾构小曲线下穿地铁施工技术 被引量:4

Construction Technology of Large Diameter Active Articulated Shield Passing through Subway under Small Curve
下载PDF
导出
摘要 文章以广州佛莞城际FGZH-1标2台开挖直径Φ8.85 m、采用主动铰接形式的土压平衡盾构机,在R=600 m小曲线条件下下穿广州地铁三号线施工为例,详细地分析了本次施工技术重难点,并着重介绍了施工前后注意事项与掘进过程中的控制措施。该项施工技术在同等型号的盾构施工中尚属首次,施工难度大,安全风险高,目前2台盾构机均已顺利穿越地铁三号线,可为类似工程提供参考。 Taking the construction of Guangzhou metro line 3 passing underneath by R=600 m small curve of Guangzhou Foshan Dongguan intercity railway FGZH-1 bid section as an example,two sets of earth pressure balance shield machines with the excavation diameter of Φ8.85 m and the form of active articulation are used.The key points and difficulties of the construction technology are analyzed in detail,and the precautions before and after the construction and the control measures in the process of excavation are emphatically introduced.This construction technology is the first time used in the same type of shield construction,which is difficult to construct and of high safety risk.At present,two shield machines have successfully passed through the Guangzhou metro line 3,providing reference for similar projects.
作者 吕岩 LV Yan(China Railway 20 th Bureau Group 5 th Engineering Co.Ltd.,Kunming 650200)
出处 《现代隧道技术》 EI CSCD 北大核心 2020年第S01期957-962,共6页 Modern Tunnelling Technology
基金 中铁二十局集团第五工程有限公司研发项目(YF1905SD07D).
关键词 盾构 大直径 主动铰接 小曲线 下穿地铁 Shield Large diameter Active articulation Small curve Traverse below subway
  • 相关文献

参考文献8

二级参考文献23

共引文献31

同被引文献40

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部