期刊文献+

煤矿主运输系统集中控制改造研究 被引量:7

Study on Central Control and Transformation of Main Transportation System
下载PDF
导出
摘要 对某矿主运输系统集中控制改造方案进行了介绍,分析了技术方案及网络结构以及主运输系统集中控制系统的配置、功能.通过主运输系统集中控制改造,实现了一站同时控制多部带式输送机及配套设施的各项操作,减少了井下作业人数,提高了工作效率,应用效果良好,符合煤矿智能化的发展趋势. The scheme of centralized control transformation of main transportation system in official mine is summarized, and the technical scheme and network structure, as well as the configuration and function of centralized control system of main transportation system are analyzed. Through the centralized control transformation of the main transportation system, the operation of multiple belt conveyors and supporting facilities can be controlled at one station at the same time, the number of underground operations is reduced, the working efficiency is improved, and the application effect is good, which is in line with the development of coal mines.
作者 李志国 Li Zhiguo(Ximing Mine of Shanxi Xishan Coal and Power Co.,Ltd.,Taiyuan Shanxi 030052)
出处 《机械管理开发》 2020年第11期149-150,153,共3页 Mechanical Management and Development
关键词 主运输系统 集中控制 远程监测 main transport system centralized control remote monitoring
  • 相关文献

参考文献1

共引文献2

同被引文献35

引证文献7

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部