摘要
在对影响岩巷掘进效率因素分析的基础,提出了提高岩巷掘进效率的措施,包括提高设备配套水平、合理组织生产和完善施工方法和工艺.将优化措施应用于成庄矿后,生产效果良好,与以前的岩巷掘进技术相比,既减少了人员数量,又提高了掘进进尺,取得了良好的经济效益和社会效益.
Based on the analysis of the factors affecting the tunneling efficiency of rock roadway, the countermeasures to improve the tunneling of rock roadway are put forward, including improving the supporting level of equipment,organizing production reasonably and perfecting the construction method and technology. After applying the optimization measures to Chengzhuang Mine, the production effect is good. Compared with the previous rock roadway tunneling technology, it not only reduces the number of personnel, but also improves the driving ruler, and obtains good economic and social benefits.
作者
杨志强
Yang Zhiqiang(Jincheng Coal Group Chengzhuang Mine,Jincheng Shanxi 048000)
出处
《机械管理开发》
2020年第11期183-184,203,共3页
Mechanical Management and Development
关键词
煤矿岩巷
快速掘进
设备
coal mine rock roadway
fast tunneling
equipment