摘要
以福州滨海新城市政道路沥青路面平整度专项整治为背景,详细介绍了路面底基层、基层、面层等各结构层施工全过程重点控制的开工环节、施工中间环节和验收环节的不同施工控制要点。即:在开工环节抓好试验段铺设;施工中间环节把下承层关、原材料关、机械设备关、施工工艺关、技术交底关;验收环节重点检测平整度、厚度、压实度。该施工各环节关注要点可归纳为“试一段、把五关、检三度”,有利于市政道路工程施工和监督管理。
Based on the special improvement of asphalt pavement flatness of Fuzhou Binhai New Urban Road,it introduces in detail the different construction control points of the key control points in the whole construction process of the pavement subbase,base,surface and other structural layers.Namely:Pay attention to the laying of the test section during the start of construction;In the middle of construction,the subordinate layer,raw materials,machinery and equipment,construction technology,and technology are closed;The inspection process focuses on flatness,thickness,and compaction.The focus of each link of the construction can be summarized as"test one section,check five passes,and check three times",which is conducive to the construction and supervision of municipal road engineering.
作者
黄庆财
HUANG Qingcai(Fuzhou new area development&investment group Co.,Ltd,Fuzhou 350005)
出处
《福建建筑》
2020年第11期117-120,146,共5页
Fujian Architecture & Construction
关键词
平整度
沥青路面
市政道路
Road roughness
Asphalt road
Municipal roads