期刊文献+

南阳南站大跨钢桁架累积提升施工技术

Construction Technology of Long Span Steel Truss Cumulative Lifting in Nanyang South Railway Station
下载PDF
导出
摘要 结合南阳南站大跨屋盖桁架整体施工方案选取、提升施工方案制订,介绍了大跨钢结构屋盖桁架整体施工方案优选、提升施工方案设计。通过重点介绍大跨屋盖桁架累积提升各类提升上吊点设计、下吊点设计及其适用性,为其他大跨钢结构施工提供了参考。 Based on the selection of the overall construction scheme of the large-span roof truss of Nanyang south station and the formulation of the lifting construction scheme,this paper introduces the optimization of the overall construction scheme of the largespan steel structure roof truss and the design of the lifting construction scheme.This paper mainly introduces the design and applicability of the upper lifting point and the lower lifting point of the long-span roof truss cumulative lifting,which provides a reference for the construction of other large-span steel structures.
作者 路勇 Lu Yong
出处 《建筑技术开发》 2020年第18期28-29,共2页 Building Technology Development
关键词 屋盖桁架 累积提升 提升支架 上吊点 下吊点 roof truss cumulative lifting lifting bracket upper lifting point lower lifting point
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部