摘要
针对浦东机场卫星厅工程钢结构、幕墙、金属屋面的结构构造特点,分布范围广且工作量大,在机场不停航施工的前提下,采用"钢结构–幕墙"一体化建造技术、大跨度空间双曲桁架施工模拟建造技术、"钢结构–金属屋面"一体化建造技术、数字化建造技术等技术措施和管理措施,安全、经济、高效地解决了整个工程的钢结构、幕墙、金属屋面的建造难题,对后续机场大型工程建设施工起到借鉴作用。
In view of the structural characteristics of steel structure,curtain wall and metal roof of Pudong Airport Satellite hall project,which has a wide range of distribution and a large workload,on the premise of the airport construction without suspension,the integrated construction technology of "steel structure curtain wall",large-span space hyperbolic truss construction simulation construction technology,integrated construction technology of "steel structure metal roof" and digital construction technology are adopted technical measures and management measures,such as technology,have solved the construction problems of steel structure,curtain wall and metal roof of the whole project in a safe,economic and efficient way,which will play a reference role in the construction of large-scale airport projects in the future.
出处
《建筑技术开发》
2020年第18期76-78,共3页
Building Technology Development
基金
上海建工集团资助课题(16DZ1201503)。
关键词
不停航施工
施工模拟建造
一体化施工
数字化施工
nonstop construction
construction simulation construction
integrated construction
digital construction