1Redmond A, Hore A, Alshawi M, et at. Exploring How Information Exchanges Call be Enhanced Through Cloud BIM[J].Automation in Construction,2012 ( 24 ): 175-183.
2Lipman,Rohert R. Details of the mapping between the CIS/2 and IFC product data models for structural steel[J].Electronic Journal of lnfinnation Thnology in Construction,2009 14):1-13.
3J.Infrastruct.Syst. Life-Cycle Costing in Municipal Construction Projeets[JI. Journal of lnfrastueture Systems, 1996,2( 1 ):125-128.
4McClelland D.M., Bowles D S. Towards improved life loss estimation methods: lessons from case histories [M].Seinajoki: Rescdam Seminar,2000.
5CARMEN Constantinescu, CHRISTOPHR unde, JOHANNESV- olkmann,el al. D1 definition of a VR based collaborative digital manufacturing environment[R].[S.L]:lnformation stiety Techologies, 2007.
6Dones R ,Gantner U, Hirschberg S. Environmental inventories for future electricity supply Systems for Switzerland [R].Switzerland: Paul Scherrer Institute, 1996.