摘要 预应力张拉施工技术是桥梁工程施工的关键技术之一,为桥梁施工提供了技术支持,在很大程度上提升了桥梁工程项目施工的整体质量。在现浇箱梁预应力张拉施工中,技术人员需要明确施工质量控制要点,提升桥梁工程项目的整体质量。论文主要结合工程实例,对现浇箱梁预应力张拉施工技术的具体应用和技术要点进行分析。 The prestressed tension construction technology is key technology in bridge construction,which provides technical support for bridge construction and improves the overall quality of bridge engineering project construction to a great extent.In the construction of cast-in-place box girder prestressed tension,technicians need to clarify the key points of construction quality control and improve the overall quality of bridge engineering projects.This paper analyzes the concrete application and technical points of the prestressed tension construction technology of cast-in-place box girderwith engineering examples.
作者 陈红亮 CHEN Hong-liang(Central South Construction Group Co.Ltd.,Changsha 412007,China)
出处 《工程建设与设计》 2020年第22期138-139,共2页 Construction & Design for Engineering
关键词 现浇箱梁 预应力张拉 施工技术 cast-in-place box girder prestress tensioning construction technology
  • 相关文献

参考文献2

二级参考文献6

共引文献18

同被引文献32

引证文献11

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部