2Wang X, Love P E D, Kim M J, et al. A conceptual framework fur integrating building information modeling with augmented reality [ J ]. Automation in Construction, 2013 ( 34 ) :37-44.
3Fard M G, Pefia-Mora F. Application of visualization techniques for construction progress monitoring [ J ]. Computing in Civil Engineering, 2007 : 216 -223.
4Kirehner J, Kramer T. Constraint-basierte discrete-event simulation yon bau-terminp|~lnen rail hilfe yon erweiterten petri netzen [ C ]//Forum Bauinformatik, 2013 : 155-167.
5Kamat J C, Martinez M, Fischer M G, et al. Research in visualization techniques for field construction [ Jl. Construction Engineering and Management, 2011 ( 137 ) : 853-862.
6GUO Q,ZHANG M.An agent-oriented approach to resolve scheduling optimization in intelligent manufacturing[J].Robotics and computer-integrated manufacturing,2010(26):39-45.
8FRANKOWIAK M,GROSVENOR R,PRICKETT P.A review of the evolution of microcontroller-based machine and process monitoring[J].International journal of machine tools and manufacture,2005,45(4):573-582.
9GILLENWATER E L,CONLON S,HWANG C.Distributed manufacturing support systems:the integration of distributed group support systems with manufacturing support systems[J].Omega-international journal of management science,1995,23(6):653-665.