期刊文献+

分析围海造地工程的重点技术问题

Analysis of Key Technical Issues in the Reclamation of Land from Sea
下载PDF
导出
摘要 分析了围海造地常规施工方法的适用条件,总结了回填围海造地和吹填围海造地的特点和差异,简单介绍了吹填施工工艺、围海造地验收标准以及围海造地工程项目管理,统计归纳了围海造地成本的影响因素,以供今后围海造地工程或类似工参考,逐步提高围海造地工程技术水平、降低造地成本。 This article analyzes the applicable conditions of conventional construction methods for the reclamation of land from sea,summarizes the characteristics and differences between backfilling and reclamation from the sea,and briefly introduces the construction technology of hydraulic reclamation,acceptance criteria for the reclamation of land from sea,and project management of the reclamation of land from sea,statistically summarizes the influencing factors of the cost ofthe reclamation of land from sea,for reference in future reclamation projects or similar projects,and to gradually improve the technical level of the reclamation of land from sea and reduce land reclamation costs.
作者 陈琴琴 CHEN Qin-qin(Kunshan Transportation Bureau,Kunshan 215300,China)
出处 《价值工程》 2020年第33期116-117,共2页 Value Engineering
关键词 施工工艺 成本分析 验收标准 项目管理 construction technology cost analysis acceptance criteria project management
  • 相关文献

参考文献1

二级参考文献2

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部