摘要 某电厂2号机组四大管道支吊架运行过程中暴露多处缺陷。本文利用CAESAR Ⅱ软件对管系进行系统的应力分析,并结合现场检查结果,在冷态时对四大管道支吊架进行相应调整,确保机组的安全稳定运行,最后对支吊架的检查维护提出了意见。 Several defects were exposed during the operation of the four major pipeline supports and hangers of Unit 2 of a power plant. This paper used CAESAR Ⅱ software to carry out systematic stress analysis on the piping system,and combined with the on-site inspection results, adjusted the four major pipeline supports and hangers in cold state to ensure the safe and stable operation of the unit, finally put forward opinions on the inspection and maintenance of supports and hangers.
作者 李嘉伦 郭永鹏 李楠林 张伦伦 LI Jialun;GUO Yongpeng;LI Nanlin;ZHANG Lunlun(Sinopec Great Wall Energy chemical(Ningxia)Co.,Ltd.,Yinchuan Ningxia 751400;Xi'an Thermal Power Research Institute,Xi'an Shaanxi 710054)
出处 《河南科技》 2020年第32期121-123,共3页 Henan Science and Technology
关键词 四大管道 支吊架 调整 应力校核 four main pipes hanger adjustment stress check
  • 相关文献

参考文献4

二级参考文献8

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部