期刊文献+

超前探水技术措施在竖井施工中的研究与应用 被引量:5

Research and Application of Technology Measures of Exploring Water Ahead of Time in Shaft Construction
下载PDF
导出
摘要 预防井巷施工过程中突发大量涌水,从而引起水灾,是矿山施工安全管理过程中防治水的主要目的。透水事故虽然发生频次较低,但事故造成的危害往往比触电、机械、顶板等原因引起的事故严重。通过阐述某竖井施工过程中,严格按照“有疑必探,先探后掘”的原则,通过合理谋划,科学设计,根据实施方案利用钻机积极开展超前探水工作,可有效确保施工的安全有序开展,同时可提高竖井施工效率。 Preventing a large amount of sudden water gushing during shaft construction from causing floods is the main purpose of water prevention and control during mine construction safety management.Although the frequency of flooding accidents is relatively low,the hazards caused by accidents are often more serious than those caused by electric shock,machinery,roof and other reasons.This paper expounds that in the construction process of a vertical shaft,in strict accordance with the principle of“exploring when there is doubt,exploring first and then excavating”,through reasonable planning and scientific design,and actively exploring water ahead of time by drilling rigs according to the implementation scheme,the safe and orderly construction can be effectively ensured,and the construction efficiency of the vertical shaft can be improved at the same time.
作者 邸翔宇 DI Xiangyu(Anshan Minmetals Chentaigou Mining Co.,Ltd.,Anshan,Liaoning 114000)
出处 《矿业工程》 CAS 2020年第5期19-21,共3页 Mining Engineering
关键词 防治水 超前探水 竖井施工应用 prevention and control of water exploring water ahead of time application of shaft construction
  • 相关文献

同被引文献34

引证文献5

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部