三角变截面轻型桁架导梁设计与顶推施工关键技术 被引量:2

Key Technology of Design and Incremental Launching Construction of Triangular Variable Section Light Truss Guide Beam
下载PDF
导出
摘要 结合温州七都北汊桥引桥钢箱梁导梁施工项目,对多跨钢箱梁三角变截面桁架轻型导梁的设计、临时支架与顶推支座的布置、各工况安全分析、预抛高设置等内容进行了总结和研究。通过采取有效的控制措施,确保了钢箱梁三角桁架轻型导梁的安全施工,可为今后类似工程提供借鉴。 Combined with the construction project of steel box girder guide beam of approach bridge of Qidu Beicha bridge in Wenzhou,the design of light guide beam with triangular variable cross-section truss of multi span steel box girder,the layout of temporary support and pushing support,safety analysis of various working conditions and setting of pre throwing height are summarized and studied.By taking effective control measures,the safe construction of the steel box girder triangular truss light guide beam is ensured,which can provide reference for similar projects in the future.
作者 李吉勇 LI Jiyong(Shanghai Foundation Engineering Group Co.,Ltd.,Shanghai 200433,China)
出处 《建筑施工》 2020年第11期2135-2138,共4页 Building Construction
关键词 钢箱梁 导梁 顶推 三角桁架 受力分析 steel box girder guide beam incremental launching triangular truss stress analysis
  • 相关文献

参考文献3

二级参考文献6

共引文献7

同被引文献7

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部