摘要
时滞补偿是建筑抗震实时混合试验的重要问题。文章对时滞补偿方法的研究进行总结,将时滞补偿方法分为基于时间的位移预测时滞补偿方法、基于反馈力的位移预测时滞补偿方法、基于加载系统模型求逆的时滞补偿方法、基于控制理论的时滞补偿方法和基于集成理念的综合补偿方法。
Time-delay compensation is an important problem in the real-time hybrid seismic testing of buildings.In this paper,research on time-delay compensation methods are summarized and these methods are divided into time-based displacement prediction,displacement prediction based on the feedback force,methods based on loading system model inversion,methods based on control theory,and comprehensive compensation methods based on concept integration.All of these methods are introduced and described.
作者
刘洪波
刘洁
LIU Hongbo;LIU Jie(Zhengzhou University of Aeronautics, Zhengzhou 450015, Henan, China)
出处
《地震工程学报》
CSCD
北大核心
2020年第6期1361-1368,共8页
China Earthquake Engineering Journal
基金
国家自然科学基金(51508524)
河南省科技研发项目(192102310018)。
关键词
建筑抗震
实时混合试验
时滞补偿
earthquake-resistance of building
real-time hybrid test
time delay compensation