新冠疫情下合同变更后工程价款调整方法浅析 被引量:2

Discuss the Legal Basis for Contract Change or Termination under the Influence of the new Crown Pneumonia Epidemic and the Application of Engineering Cost Adjustment Methods in Engineering Audit Practice
下载PDF
导出
摘要 2020年1月,新冠肺炎疫情在武汉爆发并影响全国。2月10日全国人大工法委明确新冠肺炎疫情属于不可抗力事件。新冠疫情后,建设工程合同是变更还是解除?如何处理工程索赔?基于此,尝试从法律层面分析这次事件的法律事实和法律定位,并结合合同履约、工程价款调整方法、结算审计实务,探讨其在工程审计实践中的运用。 In January 2020,the new crown pneumonia epidemic broke out in Wuhan and affected the whole country.On February 10,the Work and Law Committee of the National People’s Congress made it clear that the new crown pneumonia epidemic was a force majeure event.After the new crown epidemic,is the construction contract changed or cancelled?How to deal with engineering claims?Based on this,try to analyze the legal facts and legal positioning of this incident from the legal level,and discuss its application in engineering audit practice in combination with contract performance,project price adjustment methods,and settlement audit practices.
作者 顾文燕 GU Wen-yan
出处 《当代会计》 2020年第20期72-74,共3页 Contemporary Accounting
关键词 新冠肺炎疫情 不可抗力 索赔 工程审计 New Crown Pneumonia Epidemic Force Majeure Claims Engineering Audit
  • 相关文献

二级参考文献12

共引文献33

同被引文献8

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部