摘要
蒸汽发生器二次侧泥渣冲洗是核电站蒸汽发生器维修管理的一个重要组成部分,泥渣冲洗技术在现场应用前需要对其工艺进行功能性和安全性的验证。该文描述了蒸汽发生器二次侧泥渣冲洗验证的实施过程及结果,为后续其他蒸汽发生器二次侧泥渣冲洗技术的验证工作提供了参考和借鉴。
The sludge lancing technology of steam generator secondary side is an important part of nuclear power plant maintenance management.Before site application of sludge lancing,it is necessary to verify the functionality and safety of the process.This paper describes the implementation process and results of the sludge lancing verification for steam generator secondary side.It provides some references for the other sludge cleaning verification technology for steam generator secondary side.
作者
熊前山
刘一博
贺小明
张高剑
陶子航
秦骥
XIONG Qian-shan;LIU Yi-bo;HE Xiao-ming;ZHANG Gao-jian;TAO Zi-hang;QIN Ji(China Nuclear Power Operation Technology Co.,Ltd.,Wuhan,Hubei Prov.430223;Research Institute of Nuclear Power Operation,Wuhan,Hubei Prov.430223)
出处
《中国核电》
2020年第5期630-633,共4页
China Nuclear Power
关键词
蒸汽发生器
泥渣冲洗
安全性
功能性
验证
steam generator
sludge lancing
safety
functionality
verification