摘要 为研究CPR1000和AP1000机组主控室应急运行方式上的特点,通过对比CPR1000和AP1000机组应急规程的设计原理、规程文件体系及蒸汽发生器传热管破裂事故工况下CPR1000和AP1000机组主控室应急运行方式,总结了两类机组应急运行方式下主控室岗位设置、岗位职责、指挥体系、规程执行等方面的特点及差异。两类机组主控室应急运行方式存在不同,根本原因在于技术路线的差异,事故工况主控室能否高效运作关键取决于运行人员能否够高效执行事故程序及相关管理规定。 In order to study the characteristics of emergency operation modes of CPR1000 and AP1000 main control rooms,the characteristics and differences in post setting,post responsibilities,command system,and procedure execution of the main control rooms under CPR1000 and AP1000 emergency operation modes are summarized by comparing the principles and procedure documents of CPR1000 and AP1000 emergency procedures and the emergency operation modes of CPR1000 and AP1000 main control rooms under SGTR accident conditions.The emergency operation modes of the main control rooms of the two types of units are different.The fundamental reason lies in the difference of technical routes.The efficient operation of the main control rooms under accident conditions depends on whether the operators can effectively implement the accident procedures and relevant management regulations.
作者 王小林 申中祥 张兆虎 炊晓东 徐鹏 WANG Xiao-lin;SHEN Zhong-xiang;ZHANG Zhao-hu;CHUI Xiao-dong;XU Peng(Research Institute of Nuclear Power Operation,Wuhan,Hubei Prov.430000,China)
出处 《中国核电》 2020年第5期668-676,共9页 China Nuclear Power
关键词 应急规程 CPR1000 AP1000 主控室 应急运行 emergency procedures CPR1000 AP1000 main control room emergency operation
  • 相关文献

参考文献5

二级参考文献8

  • 1浦胜娣,李吉根.秦山核电厂蒸汽发生器传热管破裂事故分析[J].原子能科学技术,1993,27(4):289-294. 被引量:4
  • 2Liao H, Hildebrandt M. Engineering Psychology and Cognitive Ergonomics. Understanding Human Cognition [M]. Springer Berli Heidelberg, 2013 : 242-251.
  • 3Higgins J, Brown W, Fink R, et al. Human factors considerations with respect to emerging technology in nuclear power plants [ M]. US Nuclear Regulatory Commission, Office of Nuclear Regulatory Research, 2008.
  • 4Vicente K, Mumaw R, Roth E. Cognitive functioning of control room operators-Final phase [J ]. AECB Reportl Ottawa, Ontario, June, 1997, 27.
  • 5Jiang J, Zhang L, Wang Y, et al. Markov reliability model research of monitoring process in digital maincontrol room of nuclear power ptant[J]. Safety science, 2011, 49(6): 843-851.
  • 6The SPAR-H human reliability analysis method [M]. US Nuclear Regulatory Commission, 2005.
  • 7冉旭,方红宇.状态导向规程引导下的蒸汽发生器给水流量完全丧失事故分析研究[J].核动力工程,2010,31(S1):8-10. 被引量:6
  • 8方立奎,冯文彪.DCS环境下防人因失误研究[J].仪器仪表用户,2012,19(4):48-50. 被引量:2

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部