期刊文献+

3Dmine在某尾矿库管理方面的应用 被引量:2

Application of 3Dmine in the Management of a Tailings Pond
下载PDF
导出
摘要 为适应数字化、可视化矿山的管理趋势,提高尾矿库管理水平,基于3Dmine矿业工程软件解决生产实际问题。通过收集整理尾矿库数据,建立尾矿库三维模型,尝试解决分析库容、核算筑坝量、估算溶液量和尾矿量、优化排尾计划等实际问题,工程实例应用达到了预期效果。对于类似矿山解决尾矿库生产实际问题具有一定借鉴意义。 In order to adapt to the trend of digital and visual mine management,to improve the management level of tailings ponds,the actual production problems are solved based on 3Dmine mining engineering software.By means of tailings pond data,a 3D model of the tailings pond was built to solve practical problems such as analysis of storage capacity,calculation of dam volume,estimation of solution volume and tailings volume,optimization of tailing discharge plan.The application of engineering examples achieves the expected effect.This study means significant to the practical problems of tailings pond production for those similar mines.
作者 张书琛 陈伟康 刘芳斌 姚刚 谢添 ZHANG Shuchen;CHEN Weikang;LIU Fangbin;YAO Gang;XIE Tian(China Railway Resources Group Co.,Ltd.)
出处 《现代矿业》 CAS 2020年第11期187-188,199,共3页 Modern Mining
关键词 尾矿库 三维建模 库容 工程量 tailing pond 3D model storage capacity engineering quantity
  • 相关文献

参考文献5

二级参考文献20

共引文献24

同被引文献19

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部