期刊文献+

EPC工程总承包模式施工管理难点与措施 被引量:3

Difficulties in Site Construction Management and Measures under EPC Project General Contracting Model
下载PDF
导出
摘要 随着我国建筑行业的快速发展,传统的现场施工管理模式已无法适应现代工程较为复杂的施工管理需要,建筑企业须加强对EPC工程总承包模式等现代企业管理模式的研究,并通过积极应用EPC工程总承包模式来构建现代企业管理制度,同时结合工程项目的实际现场施工情况,准确把握EPC模式下的施工管理中的难点环节,并采取有效的管理措施,以全面提高工程现场施工管理的质量和效率,促进我国建筑工程管理水平的整体提升。 With the rapid development of construction industry in our country,the traditional site construction management mode has been unable to adapt to the modern engineering more complex construction management,construction enterprises must strengthen the EPC project general contracting model,etc. The study of modern enterprise management model,and by actively applying the EPC project general contracting model to build a modern enterprise management system,at the same time combined with the actual situation of the project site construction,accurately grasp the difficulty in the construction management of EPC mode,and take effective management measures,in order to improve the quality and efficiency of construction site construction management,promote the management level of the construction project in China.
作者 舒建平 谢俊龙 Shu Jian-ping;Xie Jun-long
出处 《建筑技术开发》 2020年第21期85-86,共2页 Building Technology Development
关键词 EPC工程总承包模式 现场施工管理 管理难点 改善措施 EPC project general contracting model site construction management management difficulties improvement measures
  • 相关文献

参考文献2

二级参考文献2

共引文献15

同被引文献19

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部