摘要 本文以广州市洛溪大桥拓宽工程为背景,主要介绍了主航道桥液压爬模的主要结构体系、功能和工作原理及相关施工技术,解决了紧邻旧桥高耸塔柱施工技术难题,节省了工期及成本,为后续同类工程提供了借鉴。 Based on the widening project of Guangzhou Luoxi Bridge,this article mainly introduces the main structural system,function and working principle of the hydraulic climbing formwork of the main channel bridge and related construction technology.It solves the technical problems of the construction of high towers next to the old bridge and saves The construction period and cost have been improved,which provides a reference for follow-up similar projects.
作者 朱书敏 ZHU Shumin(Poly Changda Engineering Co.,Ltd.,Guangzhou Guangdong 511431)
出处 《智能建筑与工程机械》 2020年第7期76-77,共2页 Intelligent Building and Construction Machinery
关键词 洛溪大桥 拓宽工程 主塔 液压爬模施工技术 Luoxi Bridge widening project main tower hydraulic climbing form construction technology
  • 相关文献

参考文献3

二级参考文献10

共引文献18

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部