摘要
为满足河网沼泽区特高压输电线路铁塔施工要求,结合特高压铁塔杆件较长较重、灌注桩基础原材料运量较大、组塔作业面大等特点,介绍在漂浮式水上平台上运用各种施工机械完成从基础到立塔的全部施工过程,为后续河网沼泽地区施工提供技术支持和施工经验。
In order to meet the construction requirements of UHV transmission line tower in marsh area of river network,combined with the characteristics of long and heavy members of UHV Tower,large transportation volume of raw materials for cast-in-place pile foundation and large working surface for tower construction,this paper introduced the application of various construction machinery on floating water platform to complete the whole construction process from foundation to tower,providing technical support and construction experience for subsequent construction in river network swamp area construction.
作者
王文魁
武晓成
WANG Wenkui;WU Xiaocheng(Shandong Fenghui Equipment Technology Co.,Ji'nan 250200;Shandong Electric Power Construction First Engineering Company,Ji'nan 250102)
出处
《现代制造技术与装备》
2020年第11期156-157,共2页
Modern Manufacturing Technology and Equipment
关键词
漂浮式水上平台
河网沼泽
铁塔
立塔
floating platform
river network swamp
iron tower
vertical tower