摘要
在武乡县东干线供水工程的事故调蓄水池建设过程中运用膨胀加强带施工,在可取代大型水池传统施工工艺、取消变形缝的前提下,降低水池漏水机率,加快施工进度,便于后期运行管理。
During the construction of the emergency storage tank of Wuxiang County East Main Line Water Supply Project,the expansion strengthening belt can replace the traditional construction technology of the large-scale water tank,cancel the deformation joint,reduce the leakage probability of the water tank,and speed up the construction progress.The later period operation and management will be convenient.
出处
《山西水利科技》
2020年第4期7-9,共3页
Shanxi Hydrotechnics
关键词
大型水池
膨胀加强带
变形缝
large-scale water tank
expansion strengthening belt
deformation joint