摘要
结合清漳河左权境内河道防护现状,在满足工程建设目标和基本功能的前提下,为了实现防洪效益与生态效益相结合,在河道治理工程设计过程中,从工程生态效果、施工条件等方面对河道治理堤防断面进行了系统分析和选型,以防洪为主的堤防采用重力式浆砌石,兼顾生态效益段新建堤防采用防洪土堤加格宾石笼护坡的断面型式。
In the light of the current situation of river protection of Qingzhang River in Zuoquan County,and on the premise of satisfying the objectives and basic functions of the project,in order to realize the combination of flood control benefits and ecological benefits,during the design process from the aspects of engineering ecological effect and construction conditions,the section of river regulation dike is systematically analyzed and selected,and the gravity type masonry is adopted for the main flood control dike,taking into account the ecological benefits,the section type of the newly-built embankment with gabion slope protection is adopted.
出处
《山西水利科技》
2020年第4期46-48,63,共4页
Shanxi Hydrotechnics
关键词
河道治理
堤防断面
设计方案
river regulation
embankment section
design scheme