期刊文献+

延迟焦化装置臭气污染分析及治理 被引量:1

Analysis and treatment of pollution of stink in delayed coking unit production
下载PDF
导出
摘要 介绍了延迟焦化装置的工艺流程,分析了装置内臭气污染产生的原因。通过采取冷焦水系统改造,切焦池上部增加蒸汽收集罩等措施,对挥发气体进行脱硫处理,解决了冷焦水、切焦水挥发臭气产生的污染,使装置周边环境明显改善。 This paper introduces the process flow of delayed coking unit and analyzes the causes of odor pollution in the unit.By means of reforming the coke cooling water system and adding a steam collecting cover on the upper part of the coke cutting pool,the volatile gas was desulfurized,and the pollution caused by the volatile odor in the coke cooling water and the coke cutting water was solved,and the surrounding environment of the device was significantly improved.
作者 吴卫兵 Wu Weibing(Sinopec-Sk(Wuhan)Pectrochemical Company Limited,Wuhan Hubei 430082,China)
出处 《环境与发展》 2020年第11期31-32,共2页 Environment & Development
关键词 延迟焦化装置 环境污染 碱洗 脱硫 Delayed coking unit Environmental pollution Alkali wash Sulfur removal
  • 相关文献

参考文献1

二级参考文献2

共引文献7

同被引文献6

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部