为实现高速公路大断面黄土隧道机械化配套施工,文中以定临高速公路黑庄坪隧道工程为依托,通过对影响大断面黄土隧道开挖、初支关键工序的机械化配套存在的问题进行研究,提出超前支护、超欠挖控制关键技术措施,并在黑庄坪隧道得到成功应用。
To realize the mechanization construction of large section loess tunnel of expressway,based on the set of Heizhuangping tunnel project in Dinglin highway,the problems existing in the mechanization matching of key procedures which will affect the excavation and initial support of large section loess tunnel are discussed.At the same time,the key technical measures of advanced support and overbreak control measures are discussed,and the research results are successfully applied in Heizhuangping tunnel.
作者
刘文学
窦建军
王乐
赵盼
邱胜进
LIU Wenxue;DOU Jianjun;WANG Le;ZHAO Pan;QIU Shengjin(China Railway Engineering Equipment Group Co.,Ltd.,Zhengzhou 450016,China;Road and Bridge Engineering Company of The China Railway Seventh Group,Baoji 721015,China;Xi′an China Railway Equipment Co.,Ltd.,Xi′an 710000,China)
出处
《交通科技》
2020年第6期101-104,共4页
Transportation Science & Technology
关键词
大断面黄土隧道
机械化配套
悬臂掘进机
初期支护
非爆法开挖
large section loess tunnel
mechanization matching
cantilever roadheader
primary support
non-explosive excavation