再交涉制度对建设工程施工合同适用情势变更原则的影响分析 被引量:5

Research on the Effect of Renegotiation System on Situation Alteration Principle in Construction Project Contract
下载PDF
导出
摘要 通过对既有情势变更的审判案例及法院最终审判意见进行分析,找出现行情势变更原则在建设合同纠纷判定中的限制与不足,并对《合同编》中引入的再交涉制度在建设合同发生纠纷时发挥的效率价值进行分析。最终得出结论:在建设工程施工合同的履行中,引入再交涉制度对情势变更纠纷进行处理,能够有效缓解法官基于个人对法律认知不同导致法律适用时的不确定性,对保护建设合同双方意思自治、实现法的效率价值、促进合同顺畅进行具有现实意义。 The paper finds out the limitation and deficiency of the current principle of change of circumstances in dispute determination by the analysis of the trial cases of the change of circumstances and the final judgment of the court,in addition,makes analysis of the efficiency value of the renegotiation system introduced in the“Contractual Arrangements”when it occurs disputes for construction contract.Finally,During the implementation of construction project contract,it is possible to alleviate judge’s uncertainty when applying the law based on different personal legal cognition,if the renegotiation system is introduced to deal with disputes related to changed circumstances.This is of great significance to protect autonomy of both parties’will in construction project contract,realize the efficiency value of law,and smooth the contract implementation.
作者 沈栋 SHEN Dong(Rail Transportation Engineering Co.,Ltd.of China Railway 19th Bureau Group Co.,Ltd,Beijing 101399,China)
出处 《建筑经济》 北大核心 2020年第12期31-35,共5页 Construction Economy
基金 中铁十九局集团有限公司科技发展计划项目(13-18B)。
关键词 情势变更 再交涉制度 效率价值 诚实信用原则 change of circumstance renegotiation system efficiency value principle of good faith
  • 相关文献

二级参考文献14

同被引文献23

引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部