资源投入在工程项目建设中占比很大,对项目进度控制、经济效益、质量与安全管理起着决定性的作用,是项目管理的重要组成部分。重点对海洋工程项目资源类型和特点进行深入分析,对资源优化的两种模式“工期固定-资源平衡”和“资源有限-工期最短”进行研究,并通过工程实例验证,明确海洋工程项目施工资源计划优化的一般方法,对项目资源管理工作具有一定的借鉴意义。
Resource investment accounts for a large proportion in project,which plays a decisive role in project schedule control,economic benefits,quality and safety management,and is an important part of project management.This paper focuses on the resource types and characteristics of offshore engineering projects,studies the two modes of resource optimization:“fixed duration-resource balance”and“limited resources-shortest duration”,and clarifies the general methods of resource planning optimization of offshore engineering projects through the verification of engineering examples,which has certain reference significance for project resource management.
作者
宋青武
高本金
马红旗
王圣强
李记忠
王凯华
SONG Qingwu;GAO Benjin;MA Hongqi;WANG Shengqiang;LI Jizhong;WANG Kaihua(Offshore Oil Engineering Co.,Ltd.,Tianjin 300451,China)
出处
《石油工程建设》
2020年第6期79-83,共5页
Petroleum Engineering Construction
关键词
海洋工程
资源优化
进度计划
时标网络计划
offshore engineering
resource optimization
schedule plan
time-coordinate network plan