摘要
为了研究风电建设项目施工期对环境的影响,从施工过程中可能产生污染环节(水污染、大气污染、噪声污染、固体废弃物、生态)进行分析,并提出施工期控制污染的应对策略;在严格落实污染应对策略的情况下,可将施工期对环境污染限定在可控范围。
In order to study the impact of the construction period of the wind power construction project on the environment, the possible pollution links(water pollution, air pollution, noise pollution, solid waste, ecology) during the construction process are analyzed, and the Countermeasures for pollution control during the construction period are proposed;under the strict implementation of the Countermeasures for pollution, the environmental pollution during the construction period can be limited to a controllable range.
作者
张嘉宸
Zhang Jiachen(The Engineering Construction Branch Company of Huanghe Hydropower Development Co.,Ltd.,Xi’ning 810000,China)
出处
《广东化工》
CAS
2020年第21期120-121,共2页
Guangdong Chemical Industry
关键词
风力发电
施工期
应对策略
环境保护
wind power generation
construction period
coping strategy
environmental protection