论述风力发电建设项目施工期对环境的影响与应对策略

Discussion on the Impact of Wind Power Construction Project on the Environment during the Construction Period and Countermeasures
下载PDF
导出
摘要 为了研究风电建设项目施工期对环境的影响,从施工过程中可能产生污染环节(水污染、大气污染、噪声污染、固体废弃物、生态)进行分析,并提出施工期控制污染的应对策略;在严格落实污染应对策略的情况下,可将施工期对环境污染限定在可控范围。 In order to study the impact of the construction period of the wind power construction project on the environment, the possible pollution links(water pollution, air pollution, noise pollution, solid waste, ecology) during the construction process are analyzed, and the Countermeasures for pollution control during the construction period are proposed;under the strict implementation of the Countermeasures for pollution, the environmental pollution during the construction period can be limited to a controllable range.
作者 张嘉宸 Zhang Jiachen(The Engineering Construction Branch Company of Huanghe Hydropower Development Co.,Ltd.,Xi’ning 810000,China)
出处 《广东化工》 CAS 2020年第21期120-121,共2页 Guangdong Chemical Industry
关键词 风力发电 施工期 应对策略 环境保护 wind power generation construction period coping strategy environmental protection
  • 相关文献

参考文献12

二级参考文献34

共引文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部