期刊文献+

大断面全煤巷道支护设计优化 被引量:1

Support Design Optimization of Large Section All-coal Roadway
下载PDF
导出
摘要 通过分析野川煤业3101工作面运输巷变形原因,得出了由于巷道顶煤留设较厚,内部裂隙发育,加之巷道支护强度较弱直接导致了巷道变形严重。通过支护设计优化,并对3102工作面运输巷围岩移近量进行监测,顶板最大下沉量195 mm,两帮最大移近量108 mm,相比优化前有了明显降低,证明优化后的支护方案科学合理。 By analyzing the deformation cause of transport roadway on the working face of No.3101 in Yechuan Coal Industry,it is concluded that the roadway deformation is serious due to the thick top coal reserve,the development of internal cracks and the weak supporting strength of the roadway.Through support design optimization and monitoring of surrounding rock movement of transportation roadway in 3102 working face,the maximum subsidence of roof is 195 mm and the maximum movement of two sides is 108 mm,which is significantly lower than before optimization,which proves that the optimized support scheme is scientific and reasonable.
作者 赵雷 ZHAO Lei(Yechuan Mining Co., Ltd.,Shanxi Coal Transport and Marketing Group,Gaoping 048400,China)
出处 《煤》 2020年第12期17-18,26,共3页 Coal
基金 内蒙古自治区自然科学基金项目(2019MS0505)。
关键词 全煤巷道 支护设计 巷道围岩 all-coal roadway support design surrounding rock of roadway
  • 相关文献

参考文献5

二级参考文献37

共引文献26

同被引文献4

引证文献1

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部