期刊文献+

变电二次设计常见问题及处理策略

Common Problems in Secondary Design of Transformer and Their Treatment Strategies
下载PDF
导出
摘要 随着我国经济发展速度的逐渐加快,电力系统的设计规划工作中出现了技术革新的趋势。在大量新技术和生产工艺的加持下,变电站的整体运行效率和工作质量都出现了飞跃式的提升。占地规划缩小,操作智能化且简单化,都有利于设计和管控,降低出现问题的概率。在设计变电系统的过程中,相关人员需要严格按照基础标准进行规划,并调整二次设计中的常见问题,从而进一步提升变电站运行的可靠性和稳定性,增强安全保障。 With the gradual acceleration of China’s economic development,the power system design and planning work has appeared the trend of technological innovation.With the support of a large number of new technologies and production processes,the overall operation efficiency and work quality of the substation have been improved by leaps and leaps.Small land occupation planning,intelligent and simple operation,conducive to design and control,reduce the probability of problems.In the process of substation system design,relevant personnel need to plan in strict accordance with the basic standards,and adjust for common problems in the secondary design,so as to further improve the operation reliability and stability of the substation,enhance the security guarantee.
作者 邱慧 QIU Hui(State Grid Yangzhou Power Supply Company,Yangzhou 225000,China)
出处 《通信电源技术》 2020年第17期247-249,共3页 Telecom Power Technology
关键词 变电设计 可靠性 安全性 substation design reliability security
  • 相关文献

二级参考文献38

共引文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部