摘要 双面叠合剪力墙是将两块先后预制的混凝土薄板通过桥架钢筋连接,形成内部空腔的结构。由于双面叠合剪力墙操作难度较大,易发生叠合压入困难,两块预制板错位,钢筋露筋厚度偏厚,门窗洞处开裂等质量问题,针对这些技术问题,需采取控制措施加以解决。 Double-side precast concrete superposed shear wall is a structure using bridge steel to connect two pieces of precast concrete plate into a cavity structure.There are many difficulties in double-side precast concrete superposed shear wall construction,such as difficulty in superposing and pressing,dislocation of two pieces of precast slab,exposed steel and excessive thickness,crack at door and window openings,etc.Control measures shall be adopted to solve these technical problems.
作者 张骄 张程浩 金鹭云 康铁征 ZHANG Jiao;ZHANG Cheng-hao;JIN Lu-yun;KANG Tie-zheng(BCEG Advanced Construction Materials Technology Co.,Ltd.,102600,Beijing,China)
出处 《建筑技术》 2020年第12期1438-1440,共3页 Architecture Technology
关键词 双面叠合剪力墙 预制构件生产 质量控制 double-side precast concrete superposed shear wall precast component production quality control
  • 相关文献

参考文献2

二级参考文献2

  • 1刘广第.质量管理学[M].清华大学出版社,1995.
  • 2凯克.博特,阿迪.博特.世界级质量管理工具[M].中国人民出版社,2004.

共引文献6

同被引文献12

引证文献5

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部