期刊文献+

排桩与地下连续墙在逆作法施工中的应用与对比分析 被引量:4

APPLICATION AND COMPARATIVE ANALYSIS OF ROW PILES AND DIAPHRAGM WALL IN TOP-DOWN CONSTRUCTION
下载PDF
导出
摘要 结合深基坑工程案例,分析逆作法施工采用排桩与地下连续墙做基坑围护墙体的技术特点。在控制基坑和周边环境方面,采用“两墙合一”技术的能力很强,采用“桩墙合一”技术的能力居中,而采用“桩墙分离”技术的能力相对较弱。实际施工中可根据基坑特点、周边环境和经济效益等因素综合考虑选用。 Combined with the deep foundation pit engineering case,the technical characteristics of the top-down construction method using row piles and underground continuous walls as the foundation pit retaining wall are analyzed and compared.In terms of controlling the foundation pit and surrounding environment,the ability to adopt the"two-wall integration"technology is very strong,the ability to adopt the"pile-wall integration"technology is intermediate,and the ability to adopt the"pile-wall separation"technology is relatively weak.In actual construction,it can be selected according to factors such as foundation pit characteristics,surrounding environment and economic benefits.
作者 金振 JIN Zhen(Zhejiang Dongyang Third Construction Engineering Co.,Ltd.,322100,Dongyang,Zhejiang,China)
出处 《建筑技术》 2020年第12期1474-1477,共4页 Architecture Technology
关键词 基坑工程 逆作法 排桩 地下连续墙 foundation pit engineering top-down construction method row of piles underground continuous wall
  • 相关文献

参考文献4

二级参考文献14

共引文献18

同被引文献30

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部