宁明干渠24 m槽身后张法预应力施工质量控制措施 被引量:4

Post-tensioned prestressing construction quality control measures for a 24m-long aqueduct of Ningming main channel
下载PDF
导出
摘要 在大跨度结构工程中,后张法预应力混凝土是常见的结构形式。以驮英水库灌区宁明干渠下涧2#渡槽24 m槽身后张法预应力施工为例,论述了后张法预应力混凝土施工工艺和质量控制要点。 Post-tensioned prestressing concrete is a common structure for big-span works.Xiajian No.2 aqueduct of Ningming main channel in Tuoying Reservoir irrigation zone has a span of 24m.Taking the construction of this aqueduct as example,the author demonstrated the construction technology of post-tensioned prestressing concrete and the key points of quality control.
作者 林龙 苏兴彬 郭林超 LIN Long;SU Xing-bin;GUO Lin-chao(Zuojiang Drought Control Project Management Center,Chongzuo 532200,China)
出处 《广西水利水电》 2020年第6期87-89,共3页 Guangxi Water Resources & Hydropower Engineering
关键词 后张法预应力 施工技术 质量控制 宁明干渠 Post-tensioned prestressing construction technology quality control Ningming main channel
  • 相关文献

参考文献3

二级参考文献9

共引文献7

同被引文献12

引证文献4

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部