摘要
介绍了广州抽水蓄能电站A厂尾闸室排水孔设计方案,描述了排水孔出现的异常情况,对异常原因进行了分析,提出了相应的工程处理措施,其经验可供类似工程参考。
This paper introduces a design scheme of the drainage hole of the draft tube gate Chamber in the any A plant Guangdong Pumped Storage Power Station,describes the exceptienal circumstances of the drainage hole,analyzes the reasons,finds out the reasons,and advances some corresponding engineering treatment measures.Experiences can be used as a reference for similar projects in the future.
作者
宋春华
SONG Chunhua(Guangdong Hydropower Planning&Design Institute,Guangzhou 510635,China)
出处
《广东水利水电》
2020年第12期54-56,共3页
Guangdong Water Resources and Hydropower
关键词
尾闸室
排水孔
抽水蓄能电池
draft tube gate chamber
drainage hole
pumped storage power station