E+P+C模式下LNG储罐工程项目的计划管理

Plan Management of LNG Storage Tank Project under E+P+C Mode
下载PDF
导出
摘要 根据上海市燃气发展“十二五”规划,为增加上海天然气应急储备能力,经市发改委核准,于2013年开始对五号沟LNG站实施二次扩建。基于LNG储罐工程的长期复杂性,如何在E+P+C模式下通过计划管理工作高效地串联设计、采购、施工这三大核心模块,以保证项目进度全程有效受控至关重要。 According to the"12th Five-Year Plan"of Shanghai Gas Development,the second expansion of Wuhaogou LNG Station was started with the approval of the Municipal development and Reform Commission to increase the capacity of Shanghai's natural gas emergency reserve in 2013.Based on the long-term complexity of LNG storage tank project,it is very important to effectively connect the three core blocks of design,procurement and construction through planning management under the E+P+C mode to ensure the effective control of the whole project schedule.
作者 陈旭东 CHEN Xudong(Shanghai Natural Gas Pipeline Network Co.,Ltd.)
出处 《上海煤气》 2020年第6期5-9,共5页 Shanghai Gas
关键词 LNG 储罐 E+P+C模式 工程计划管理 LNG storage tank E+P+C mode project plan management
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部