期刊文献+

列车侧缓冲器吸能性能的试验研究

Study on Absorption Performance of Train Side Buffer
下载PDF
导出
摘要 通过对EN15551-2017标准进行解读,梳理出列车侧缓冲器的性能要求及测试方法,并对侧缓冲器产品样件的结构性能及吸能性能进行了系统的试验研究.研究结果表明,105 mm行程30 kJ容量侧缓冲器满足机械性能测试、静压测试、动态容量测试等性能要求. Through the interpretation of the EN15551-2017 standard,the performance requirements and test methods of train side buffer are sorted out,and the structural performance and energy absorption performance of side buffer product samples are systematically tested.The results show that the capacity side buffer with 105 mm stroke and 30 kJ meets the performance requirements of mechanical performance test,static pressure test and dynamic capacity test.
作者 梁昊 钟波 沈京哲 LIANG Hao;ZHONG Bo;SHEN Jingzhe(Technology Center,CRRC Qiqihar Vehicle Co.,Ltd,Qiqihar 161000,China;Shenzhen Cansinga Technology Co.,Ltd,Shenzhen 518101,China)
出处 《车辆与动力技术》 2020年第4期53-56,61,共5页 Vehicle & Power Technology
关键词 侧缓冲器 EN15551 吸能性能 试验分析 side buffer EN15551 energy absorption performance experimental analysis
  • 相关文献

参考文献1

二级参考文献14

  • 1А.П.БОЛДЫРЕВ,高路.俄罗斯自动车钩缓冲器结构[J].国外铁道车辆,2006,43(3):19-22. 被引量:3
  • 2TB/T1961-2006,机车车辆缓冲器[S].
  • 3AAR标准与推荐规范手册B分册,车钩和货车缓冲器部件[S].2007.
  • 4俄罗斯交通部1520mm轨距铁路(非自行)车辆计算和设计规范[S].2001.
  • 5结良,潘树平.重载货物列车连接问题的探讨[C].中国铁道学会车辆委员会2008年论文汇编,2008:99-103.
  • 6OCT 32.175:2001货车和机车用缓冲器·通用技术条件[S].
  • 7UIC 526-1:2008货车105mm行程缓冲器[S].
  • 8UIC 526-3:2008货车130mm和150mm行程缓冲器[S].
  • 9毛从强.缓冲器耐久试验标准的比较[J].铁道车辆,2008,46(11):19-20. 被引量:3
  • 10邢澍.前苏联和俄罗斯缓冲器综述[J].国外铁道车辆,2012,49(3):1-11. 被引量:2

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部