摘要
近些年来,随着建设工程信息化程度呈稳步上升态势,建设工程信息系统得到大力推广,然而,对于设计阶段工程信息往往被建设工程管理人员所忽视,以致设计变更频繁发生,影响工程的进度与成本。文章以一般工程在设计阶段的工程信息为研究对象,采用问卷调查的方式收集所需信息资料,依照信息静态传播模式,将设计阶段工程信息风险分为5个不同阶段,再使用层次分析法对其进行具体风险评估,通过对结果探究得出一系列的风险防控对策。
In recent years,with the steady rise in the level of construction engineering informatization,construction engineering information system has been vigorously promoted.However,engineering information at the design stage is often ignored by construction engineering management personnel,resulting in frequent design changes,which affects the progress and cost of the project.Therefore,based on the information of the general engineering at design phase as the research object,the questionnaire is used to collect the required information.According to the static information transmission mode,the engineering information risk in the design stage is divided into five different stages,the analytic hierarchy process is used to carry out specific risk assessment and a series of risk prevention and control countermeasures are obtained through the exploration of the results.
作者
刘孟凯
许孔毅
LIU Mengkai;XU Kongyi(School of Hengda Management, Wuhan University of Science and Technology,Wuhan 430065)
出处
《工业安全与环保》
2020年第12期69-74,共6页
Industrial Safety and Environmental Protection
关键词
风险管理
工程信息
工程信息风险
层次分析法
risk management
engineering information
engineering information risk
analytic hierarchy process