In 2018,many projects such as HIAF,SESRI,HIMM have started construction.The RF department still retains its global activities in both new technology development and RF equipment operation.With the efforts of all the colleagues in the department,many valuable results have been obtained.For the HIRFL operation and maintenance,the RF equipment runs stably throughout the year.The CSRe Barrier Bucket RF system goes well also.The cavity machining has been completed.The test results before leaving the factory indicate that the main performance indicators have satisfied the requirements.The single&half sinusoidal tests are conducted(Figs.1 and 2).