Status Report of the 320 kV High-voltage Platform in 2017

2017年320 kV综合实验平台运行情况报告
下载PDF
导出
摘要 In 2017,the 320 kV High-voltage Platform has been operated about 6700 h,including 4600 h for experiment target time,646 h for ion source tuning and beam changing,1270 h for experiment preparation with idle beam and 184 h for equipment failure time.The percentages for these activities mentioned above are 68.7%,9.6%,19%and 2.7%,respectively.In addition,48%of the operating time was contributed to IMP users,15%to other institutes 25%to universities and 12%to enterprises.The beam time distribution in terms of affiliation is displayed in Fig.1.In total,126 physics experiments from 45 research user groups have been carried out for multi-discipline science research with highly charged ions,78%of the experiments are for users outside of IMP.Among the research purpose,61%of the operating time is for material research,13%for atomic and molecular dynamics,14%for nuclear astrophysics,12%for plasma physics,and atom and molecular spectroscopy(represented in Fig.2).Many outstanding achievements were accomplished based on the experiments.About 50 papers have been published,of which 14 SCI-indexed,6 ISTP-indexed and 6 reported in key journals from IMP users.
机构地区 不详
出处 《IMP & HIRFL Annual Report》 2017年第1期241-242,共2页 中国科学院近代物理研究所和兰州重离子研究装置年报(英文版)
关键词 BEAM mentioned OUTSIDE
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部